PetowoPetowo
A knitted-wool illustration of a data centre aisle between server racks. A raised floor tile has been lifted, leaving an open hole, and a blue cable lies across the floor. Three engineers in hi-vis vests look at it, worried.

Industries / Data centres

Keep the floor safe while the racks stay live.

For data centre operators and the engineers on the floor. Report a hazard between the racks, and see which controls hold in every hall.

  • Anyone can report from their phone

  • See which controls are really working

  • Fixes are checked before they're closed

  • Your information stays private to you

The problems you know

Does any of this sound familiar?

  • On the floor

    It was only up for ten minutes.

    A lifted tile, a cable across the aisle, a ladder between racks. It's all routine, and nobody feels it is theirs to write down.

  • Contractors in the hall

    I don't know who signed them in for that.

    Vendors, fit-out crews and cleaners share the hall with your engineers. Each one follows a slightly different set of rules.

  • Live electrics

    The panel stayed open between jobs.

    Battery rooms and switchgear stay live while people work around them. A door swung back can stay that way across a shift.

Keep the hall safe while it stays live.

  • On the floor

    See which controls hold in each hall

    Each report lands on the control it is about, such as guarding open floor tiles. Barrier Health sets what your checks found beside what events said, hall by hall.

    Barrier Health lists each control with its verdict. Pedestrian segregation is in place on every check but did not hold in two events.

    Checks say a control is in place. Events say whether it held.
  • Contractors in the hall

    Contractors, with evidence that runs out

    An administrator reviews each contractor's evidence, records what was checked and sets when it expires. A permit for contractor work has to name a vetted contractor.

  • Live electrics

    Isolated, locked and tagged

    Record each isolation point with its lock and tag number. The holder applies it, and it is verified before work starts. Electrical work is one of the permit types Petowo comes with.

  • On the floor

    The tile goes back, and someone looks

    Raise the job with one owner and one due date. When it is done, someone who neither owns it nor did it checks it before it closes.

    The actions list, then one action that is closed only after an independent verification step done by someone other than its owner.

    Closed means checked, by someone who did not do the work.
  • Your words, your sites

    Data centres start from the general set-up. We then set it up in your words: your campuses, halls and rooms, your contractors, your permit conditions, your event types and your lists. An update never overwrites what you have changed.

What people ask us

Does this connect to our building management system?

Not today. Petowo records what people report, check and fix. It reads the weather for your sites, and it does not read your plant.

Can vendors report a hazard?

Yes. Invite them as guests, and guests are free with no limit. They sign in with a six-digit code sent to their email. You decide who is invited, and nobody can sign themselves up.

Do you hold an isolation against a permit?

Yes. A permit names the isolations it depends on, and a point cannot be restored while a linked permit is still open.

Can we run the same walk at every site?

Yes. Build a walk once, or start from a ready-made checklist, and set how often each hall is walked. Findings become actions with an owner and a date, and someone else checks the work.

The same knitted-wool data centre aisle. A yellow barrier guards the open floor tile, the cables are tidied, and the three engineers give a thumbs up.

Tile guarded. Cable tidied. Thumbs up.

Bring a recent event from one of your sites, and we will walk it through Petowo with you.